Pages

Showing posts with label things to do. Show all posts
Showing posts with label things to do. Show all posts

Friday, 6 March 2009

My Stash and UFOs

I am almost embarrassed about my yarn stash. I have listed on Ravelry over 100 entries but I have more to add. I am equally embarrassed about my unfinished projects that are scattered about the place too. I need to get a bit more organised and actually start using up the stuff that I do have and the project that I have started. So I have a plan . . . (I always have a plan)

From now on I will do a maximum of 4 projects at a time.

A small thing that I can take on the bus and do to and fro work. This would probably count as something like socks, mittens/gloves things in that general category. Basically anything portable and not too complicated.

Then I shall have a garment on the go. This can be an adult or child thing - anything like a sweater, skirt, dress. You catch me drift. This will be knitted at home so can involve complicated instructions or loads of colours.

Then there will be the long, long term project - the blankets or afghans, bedcovers, carpets. huge things that can get pretty boring if you are only knitting them and only them day in, day out.

And my final project group will be the frippery stuff, the things that I see and go "Oohhh" then pick up yarn and pins and start straight away.

The stuff to start with will be stash busted - but it might produce some interesting colour ways as mostly I don't have enough of a single yarn to knit an entire garment. But I have enough to be able to jig things around a bit.

First though I'm going to start with the project I have hidden around the house. Hence starting the BFF socks again (small thing for the bus). This afternoon I dragged out my Lizard Ridge knitted from JC Brett Chunky Marble (long, long term project), I'll hunt down the Topsecret sweater I start last year and almost finished but didn't quite (garment) but until I get rid of all my WIP I shall not start a frippery.

Wednesday, 3 September 2008

Things do do (knitting)

Perhaps I need to get more organised so I thought that if I had a list of things that I should be knitting or at least finishing it should give me time to get it all done. I am not a miracle worker when it comes to knitting and although I can knit quickly, it can still be more interesting to start a new project than finish up an old one. I realised that my queue list on Ravelry was becoming unmanageable and unknittable so have started a process of rationalising it. Everything that I have queued is going into my favourites and then I am going to have a maximum of 25 things in my queue so I have a choice of things but only once I have finished them then will more be added. I can see me having thousands and thousands of favourites but I do like many many things so this isn't a problem.

So the list of WIPs - this includes those that are slumbering and hibernating (I'll add photos, possibly, when I get round to it)
  • Grey Socks - these only need the very point of the toe to get them done and dusted but I lost the pattern and got excited about my Jaywalkers. I shall make them the priority as they could probably be done in an evening if I just GOT ON WITH IT!!!!
  • Topsecret - I love this, the colour is great, I really enjoyed knitting it, it knits really quickly but I got a bit unstuck when it came to the decreases after the arms. I took off too many too quickly and it looked odd and certainly didn't fit. I have to frog back to joining the arms again and start over but really it might take a long weekend and it should be done. Perhaps it's the project for the next weekend I have without my lovely man - it will keep me entertained and I will have another project off the list.
  • Striped Scallop Throw - just finish it. Perhaps I need to knit half an hour of this a day and it will get gone.
  • Fluffy - I started this and now have a person who wants it, I just have to finish it off, perhaps a couple of nights maximum. If I can remember the pattern - mind you I was just making it up so it shouldn't be too difficult to get it sorted.
  • Jaywalkers - these were started and one was completely finished and then I got sidetracked and started the second one. But never finished. I'd say a week of bus knitting should sort it out.
  • BFF - again a half finished pair of socks, but again a week of bus knitting and it should be done.
  • I Do shrug - this was meant to be for a friend and also my Tour de France KAL project but I managed to not finish it. I ran out of yarn and then the shop didn't have any more and I had to wait and then I got distracted and never went back to it.
So I have quite a list of things that need finishing - and that doesn't include those that I have already on the pins: Orange Boheme, Helena, Smackdown socks and Smackdown stole. Will I get them done? Of course I can and of course I will. No more things until I have them cracked.

Except the Aran that I am going to be knitting for my man's xmas present. He has been waiting for a couple of years so I really should get round to it.